Project Status: Abandoned

Overall★★★★★★★★★★2.00
Fun★★★★★★★★★★1.73
Innovation★★★★★★★★★★1.60
Theme★★★★★★★★★★3.07
Graphics★★★★★★★★★★2.94
Coolness★★★★★★★★★★24%
Mostly an attempt to get platformer physics right (sort of)

There was an intended storyline but due to technical difficulties I ran out of time to add any content; the door doesn't even work :/

Here's the story if you're particularly interested in what this game could have turned out to be like:
http://www.ludumdare.com/compo/2013/04/26/storytime-2/#respond

The controls are the left, right, and up arrow keys.

If you like you can change the map by editing the basement1.map file located in the data directory with a text editor, though currently only tiles with value 1 are tested for collision with the player.

JRE 6 may be needed to run the jar.

Comments9

pvwradtke
pvwradtke1 May 2013, 01:19
Couldn't get it to run on Linux. Got a black screen. Maybe the code can't find the resources?
pvwradtke
pvwradtke1 May 2013, 01:52
Not able to run on windows 7 as well. Too bad :(.
BrainSlugs83
BrainSlugs831 May 2013, 01:54
@pvwradtke: Linux has a case sensitive file system right? I bet he's using a different case to load the resources than what the files are actually named. Maybe you could try running it from a FAT32 partition? (Like a thumb drive?)
BrainSlugs83
BrainSlugs831 May 2013, 01:56
Ran fine for me on windows 7 x64 -- but it ran way too fast -- are you not timing your logic loop? And you can also jump forever (just hold down the up key) -- or maybe that's intentional (flying robots?), can't really tell since the animation happens way too fast on my machine.
Tom 7
Tom 71 May 2013, 01:57
Works ok for me! Boy is that gravity strong! :)
You should make your own kind of music, but my advice on platformer physics: keep (x, y) coordinates and (dx, dy) velocity. Every frame update dy += 0.5 or something to simulate gravity. Left and right arrow keys just add or subtract from dx, staying within some max velocity limits. Jumping just sets dy += 10 (or whatever) if on the ground.
stqn1 May 2013, 02:35
Just opens a black window with openjdk7 on linux. I like the screenshot though.

Exception in thread "main" java.lang.reflect.InvocationTargetException
at sun.reflect.NativeMethodAccessorImpl.invoke0(Native Method)
at sun.reflect.NativeMethodAccessorImpl.invoke(NativeMethodAccessorImpl.java:57)
at sun.reflect.DelegatingMethodAccessorImpl.invoke(DelegatingMethodAccessorImpl.java:43)
at java.lang.reflect.Method.invoke(Method.java:601)
at org.eclipse.jdt.internal.jarinjarloader.JarRsrcLoader.main(JarRsrcLoader.java:58)
Caused by: java.lang.IllegalArgumentException: input == null!
at javax.imageio.ImageIO.read(ImageIO.java:1388)
at com.crazynatestudios.project.AbandonedGame.<init>(AbandonedGame.java:45)
at com.crazynatestudios.project.AbandonedApp.main(AbandonedApp.java:61)
... 5 more
CrazyNate
CrazyNateauthor1 May 2013, 07:15
@pvwradtke and @stqn: Are you running the jar file in the same directory that the data and graphics folders are in? The resources it's trying to load are in those folders.

@BrainSlugs83 When I attempted to add any timing it ran too slow on my computer to test and I'm still trying to learn how to properly configure that. And I ran out of time to implement an actual jumping condition since I was too busy trying to fix collision so the up key really just changes the y velocity for collision testing purposes.

@Tom 7 setting up velocity was actually one of the few things that I did that worked, though since I didn't get jumping fixed I hadn't set a max velocity for the y direction yet since I didn't know how I should tune it.

If it would make it easier for everyone to test, should I/would it be acceptable for me to upload an updated version where you can adjust a thread sleep value so it doesn't run too fast?
zatyka2 May 2013, 03:09
It ran fine for me on Windows 8. There wasn't much to it unfortunately, but I liked the graphics style. I hope you keep with it and create the game you wrote about (it sounds pretty interesting).
stqn17 May 2013, 14:05
@CrazyNate: yes, running java -jar LD26.jar from its directory, where graphics and data are located. I just tried again and same error.

Other games by @crazynate

Found a bug?
Tell us on Discord